PowerSource
EV Charging Solutions

EV Charger
Installation.

Home or workplace EV charging, installed properly. OZEV-approved, grant-eligible, and integrated with your existing consumer unit — not bolted on as an afterthought.

OZEV Approved

Yes

Standard Installation

from £450*

Standard Install Time

3-5hr

Manufacturer Warranty

3yr

*Pricing includes OZEV grant where eligible. Standard install terms apply.

PowerSource EV Charger Installation Project

Why your EV installer actually matters.

A badly specified EV charger overloads an old consumer unit or trips under load. We assess your supply capacity first — if your property needs an upgrade to support a charger properly, we tell you before you buy one, not after.

Approved Hardware We Install

Tesla Wall Connector (from £550*)
Pod Point Solo (from £450*)
Ohme ePod / Pro (from £499*)
Zappi (Solar Smart) (from £650*)

The EV Installation Process.

Our structured, OZEV-approved delivery model guarantees seamless operation.

01

Survey & Load Assessment

We inspect your existing consumer board, calculate peak loading, and determine the safest path for cable routing.

02

Grant/Funding Check

We pre-qualify you for OZEV or Energy Saving Trust grants and handle the administrative paperwork on your behalf.

03

Install & Commission

Our qualified electricians mount the charger, run the high-grade cabling, and configure the smart app integration.

04

Certify & Register

We sign off the work under Part P regulations, issue your NICEIC certificate, and complete the manufacturer warranty registration.

OZEV EV Chargepoint Grants Available

We handle the OZEV EV chargepoint grant application paperwork as part of the job — you don't chase it yourself. Significant financial support is available if you are an eligible landlord, tenant, or flat owner.

EV Charger FAQ

Can I get an EV charger on a flat/tenement supply?

Yes, but it requires a specialized installation. Tenement properties often involve running cables from high-up distribution boards down to a ground floor or parking bay, or utilizing dynamic load balancing to ensure you do not overload the shared building supply.

How long does installation take?

A standard, straightforward EV charger installation takes between 3 to 5 hours on-site. If your property requires a consumer unit upgrade or complex routing, it may take a full day.

Do you install alongside solar or a battery?

Absolutely. We specify smart EV chargers like the Myenergi Zappi that directly integrate with your solar PV array or home battery storage, allowing you to charge your vehicle using 100% self-generated green energy.

Initiate EV Briefing.

Fill in details for your EV charger installation.

Step 01

What do you need?