PowerSource
EV Charging Solutions

EV Charger
Installation.

Home or workplace EV charging, installed properly. OZEV-approved, grant-eligible, and integrated with your existing consumer unit — not bolted on as an afterthought.

OZEV Approved

Yes

Standard Installation

from £450*

Standard Install Time

3-5hr

Manufacturer Warranty

3yr

*Pricing includes OZEV grant where eligible. Standard install terms apply.

PowerSource EV Charger Installation Project

Why your EV installer actually matters.

A badly specified EV charger overloads an old consumer unit or trips under load. We assess your supply capacity first — if your property needs an upgrade to support a charger properly, we tell you before you buy one, not after.

Approved Hardware We Install

Tesla Wall Connector (from £550*)
Pod Point Solo (from £450*)
Ohme ePod / Pro (from £499*)
Zappi (Solar Smart) (from £650*)

The EV Installation Process.

Our structured, OZEV-approved delivery model guarantees seamless operation.

01

Survey & Load Assessment

We inspect your existing consumer board, calculate peak loading, and determine the safest path for cable routing.

02

Grant/Funding Check

We pre-qualify you for OZEV or Energy Saving Trust grants and handle the administrative paperwork on your behalf.

03

Install & Commission

Our qualified electricians mount the charger, run the high-grade cabling, and configure the smart app integration.

04

Certify & Register

We sign off the work to BS 7671, issue your NICEIC certificate, and complete the manufacturer warranty registration.

OZEV EV Chargepoint Grants Available

We handle the OZEV EV chargepoint grant application paperwork as part of the job — you don't chase it yourself. Significant financial support is available if you are an eligible landlord, tenant, or flat owner.

EV Charger FAQ

Can I get an EV charger on a flat/tenement supply?

Yes, but it requires a specialized installation. Tenement properties often involve running cables from high-up distribution boards down to a ground floor or parking bay, or utilizing dynamic load balancing to ensure you do not overload the shared building supply.

How long does installation take?

A standard, straightforward EV charger installation takes between 3 to 5 hours on-site. If your property requires a consumer unit upgrade or complex routing, it may take a full day.

Do you install alongside solar or a battery?

Absolutely. We specify smart EV chargers like the Myenergi Zappi that directly integrate with your solar PV array or home battery storage, allowing you to charge your vehicle using 100% self-generated green energy.

Get an EV charger quote.

Tell us about the property and we'll price the install.

NICEIC Registered ContractorOZEV-approved EV installerFully insured. Certificate on request.

Step 1 of 3

What do you need?

CallGet quote